Well, everyone has expressed wanting to see how things are coming on. It's slow, but it is getting there. Some people may have already seen some of the pictures before.
I'm currently working on a beautiful church, I just have a few more additions and it will be complete. I think this has been my favourite build so far. At the back, you can see the war memorial I made a few weeks ago, and the terraced houses that will eventually make their way back to the table in the other room. I still have the chimneys to finish on the one.
The framework of the table is done on one side of the room, and hubby has been figuring out the electrics for the buildings along the High Street. Everything is still a mess, but it's a work in progress and beginning to come together.
This will be the front of that first panel, the High Street of my little town, St. William Once it is put in position, I'll glue the remaining buildings into place. Some have been glued, but as hubby needed to lift those he was putting lighting in, some aren't.
For now, it is just sitting down the other end of the table, out of the way. It looks so small just sitting there on part of the frame. Once it is in its proper place, I will have 2 rows of terraced houses that will sit behind the houses and pub at the right, on some kind of a step up, to add depth. They are only half as deep so as so be used as a background to the main aspects of the layout.
Here you can see a semi-aerial view. The whole are needs re-vacuuming (I have a hand held) as it seems to attract dust and "bits". The envelope, at the right, contains my Belisha beacons for the 2 zebra crossings, and the electrical stuff to make them flash on and off, like the real thing.
This weekend, we are hoping to get this panel set in its correct place, and then put the other bare panels in place so that I can start figuring out the first track route, and bring in the other dioramas-in-progress and planning where they will all go in the bigger scheme of things.
I have a "stone" farmhouse and farmworker's cottage built, and the barn to go with it, is ordered. I now have some "stone" walls that will feature around the farmyard and have been working on the "cobblestone" yard area. The greenhouse and some other buildings will probably be near the worker's cottage, and I have a cornfield to "plant". A previous attempt to do that resulted in disaster, so hopefully this time, I'll do better.
The plan for Mark's motel, KFC and Travel Center, is for it to be at the back of the other wall, and have the track on the opposite side of the road, like we see it locally, here, a lot of times.
There are people coming and going at the motel and once I have the parking spots marked out, I'll get some cars out front and people by some of them. I'd also like a couple of people going up and down the stairs. All future plans.